Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13671166

- Product Categories
- Friendly Links
- home > Supply > Ganyu plastic basketball court construction company - engineering construction factory
Information Name: | Ganyu plastic basketball court construction company - engineering construction factory |
Published: | 2015-06-02 |
Validity: | 30 |
Specifications: | 2-5mm |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Ganyu plastic basketball court construction company - engineering construction factory * Engineering Department hotline:... 17715172056 QQ 377971940 Secretary Li Gong Ding Sports-oriented research and development production and construction of integrated enterprise has experienced team of acrylic plastic basketball court stadium / silicon PU Stadium / PU course materials and badminton courts, basketball court, tennis court construction. Silicon PU basketball court construction asphalt base: uniform solid surface, no oil, no unstirred open asphalt block, smooth and no cracks, no pockmarked face, the seams are smooth, without water blocking phenomenon, compaction density of not less than 95% After a mid-sized rolling machine pressure, no significant wheel tracks, no weak skin, free of loose topsoil, waves and other phenomena, there is a certain drainage slope. New asphalt base Nature Conservancy of not less than 28 days. Silicon PU material to ensure a good bond with the underlying foundation treatment: Clean the base surface, then rinse with water, the basis should be no dirty after cleaning thereof. To mark a good bit of the identification mark water cleaning. Leveling: professional underlying TB-202 by A Group: Group B = 1: 2.5 (weight ratio) ratio Stir (construction consistency can be adjusted with water), with plastic scraper scratch over two passes to the basal plane, which calls for the the base surface voids filled, sealed to ensure that no pinholes, smooth surface dryness. Does not affect the later construction, the base surface if the gap is large, it can be added when the first Scratch A component equal parts of sand, stir scratch. Elastic layer: elastic layer (TB-002) as a one-component material, simply adjust suitable construction with thinner consistency, applied to the base surface with a toothed blade, scraping every thickness can not exceed 2.0mm, scraping every time subject to a dry solids before the interval (usually about 10 hours, depending on the scene weather conditions) until scraping to a desired thickness. Note leveling effect when Scraping, if not leveling scraping teeth marks, need to pay more in order to ensure that the surface leveling diluent. If the temperature is low (<10 ℃ = and the relative humidity is low (<60% = must be added (3-8%) water and stir evenly coated scratch, in order to accelerate the curing material, the amount of water depending on the specific site on the weather, should avoid construction in the strong sunlight. After the elastic layer to dry, with the water surface flatness test method, the water at the patch with TB-002 smooth surface or if particulate debris piled at the mill or other tool trimming required to be flat after a reinforcement layer reinforcing layer construction:.. (TB-003) for the one-component materials, construction methods consistent with the elastic layer if reinforcing layer design thin (less than 1mm), tooth knife scraping hard leveling, available rubber scraper division multiple channel coating, must ensure that the surface is smooth after debris mixed or scratch scratch if there is not at the required level in order to carry out surface finishing after construction during the construction process smooth surface:.. (TB- 205) for the two-component water-based materials, it must be prescribed proportion (A group: Group B = 9: 1 (weight ratio)), stir the two components, (ratio allowed to affect the curing effect of the surface layer, directly Performance impact surface layer) is diluted with water construction consistency, the general added 50 ~ 80% (TB-205 weight, according to the actual situation may be), with a special gun division multiple channel sprayed on strengthening the level required of the surface roughness to join special sand painting can be a minimum temperature below 5 ℃ not suitable for construction, post-construction 10 hours to maintain dry soak crossed: standard size measurement positioning, mark the boundaries of the location, along with the boundaries on both sides of textured paper posted on the court , and with the special marking paint (TB-207) between brushing textured paper, until dry surface tear Masking .TB-207 two-component material, must be prescribed proportion (A: B = 9: 1) The A, B two components mixed thoroughly, divided two brushing Ganyu plastic basketball court construction companies - manufacturers of silicon pu engineering construction Scope: Indoor and outdoor tennis courts, basketball courts, badminton courts, volleyball courts, a gym , rides venues, kindergarten grounds, school sports equipment area, the full name of fitness trails, park path, pedestrian bridges, stadiums and other sports surfaces Ganyu plastic basketball court construction company - manufacturer of engineering in the construction of your building comfortable sports venues, healthy and harmonious society. In the next process, the company will continue to professional service, professional quality concept to customer needs as their responsibility, with practical actions for the development of sports undertakings in China to make unremitting efforts! welcome to call us! |
Admin>>>
You are the 9765 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Ding Division Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 9765 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Ding Division Sports Facilities Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility